Remove 2002 Remove Building Codes Remove Painting/finishing
article thumbnail

Two Week Natural Building Intensive

Natural Building

Most of each day will be spent practicing a wide range of hands-on natural building systems, some ancient and time-tested, others experimental. The building you see here is the building we will be working on. He helped organize the first Natural Building Colloquium in 1994. Instructors: Michael G.

article thumbnail

Revit OpEd: Reference Plane IsReference Parameter

Revit OpEd

Programmers comment their code, as much to help them remember why they did what they did as well as what the code is supposed to do. Not finished apparently. Builds and Updates. Finish and Cancel Inequity. Revit Consultant - Revit Training, Revit Implementation and Navisworks I started using Revit at work in 2002.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

A new chapter for the cherished Louis Latzer Memorial Public Library

The Korte Company

The building is named after Louis Latzer , a Highland icon often referred to as “the father of PET milk,” whose innovation brought countless jobs to the community. She wanted new railings and paint for the rear entrance. Most importantly, the building didn’t meet the Americans with Disabilities Act requirements. Incredible.”

article thumbnail

Revit OpEd: Egress Path Options

Revit OpEd

Ideal we should be able to provide a total length of travel from one place to an exit, identify the length of any segment of the path and provide a clear descriptive way to show how our design meets codes in plan views, at a minimum. With a start and end baluster as starting and finishing point. Builds and Updates. Newer Post.

article thumbnail

Revit OpEd: Revit 2013 - Content Folders

Revit OpEd

The "new" version of Revit called.Revit (secret code name "One Box", not so secret now though?) Builds and Updates. Finish and Cancel Inequity. Revit Consultant - Revit Training, Revit Implementation and Navisworks I started using Revit at work in 2002. has created some new conditions for content. Newer Post. Older Post.

article thumbnail

Revit OpEd: Room Separation Lines - Agida for MEP?

Revit OpEd

Further, we are unable to accurately or efficiently create a gbXML file for use in Green Building Studio, HAP, Trace, etc. They were however using them for the room finish schedules. I have done this technique for a shell building with multiple tenant improvements that follow in their own phases. Builds and Updates.

article thumbnail

Revit OpEd: Content via Revit Furniture

Revit OpEd

If you are interested in this modern table and magazine family, EMAIL me and I can send you the link and code. Builds and Updates. Finish and Cancel Inequity. Revit Consultant - Revit Training, Revit Implementation and Navisworks I started using Revit at work in 2002. at 8:00 AM. Email This BlogThis! 1 comment: Alex Gore.