Remove 2002 Remove Change Management Remove Project Management
article thumbnail

CONSTRUCTION PROJECT FAILURE FACTORS

Job Order Contracting

Recognizing these causal factors and implementing available solutions can substantially reduce the number of failed projects, and more efficiently achieve other project objectives. Project Management: Cost, Time, and Quality, Two Best Guesses and a Phenomenon, Its Time to Accept Other Success Criteria. Cooke-Davies, T.

article thumbnail

MacDonald-Bedford Names Kozlov EVP, Prepares for Future President

CCR Magazine

Zachary Bedford since the company’s founding in 2002. As Executive Vice President, Mr. Kozlov will monitor day-to-day company affairs, participate in marketing outreach, and prepare for his role as President by acquainting himself with M-B goals, projects, and personnel. Before retiring from the U.S. “Mr. . </p>

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

The characteristics of strategic collaboration and efficient construction project delivery are discussed below. Mandatory early and ongoing collaboration for each project. Integrated planning, procurement, and project delivery processes and team. Lower project related cost growth. management. Shared boundaries.

article thumbnail

MN Officials Share Energy Efficiency & PFAS Insights at FGIA

CCR Magazine

The scope has changed for historic buildings. Another change is the revised climate zone map. Building envelope criteria has changed along with those climate zones,” said Shold. Minnesota has been working on this project since 2002. As of January 5, 2024, the IECC path went away.

article thumbnail

Increasing transparency for Copenhagen Metro with Autodesk’s Construction Cloud

Autodesk Construction Cloud

Since opening in 2002, over 1 billion passengers have travelled in the city by Metro. . And since its opening in 2002, the metro has been expanding. We are unable to collaborate on shared documents with internal and external project team members which means we spend a lot of time working in 2D,” says Joe. “We

article thumbnail

Lean methodology is ignored by the construction sector

Job Order Contracting

While there has been a fair amount written about Lean principles, actual application in the form of an integrated construction planning, procurement, and project delivery methodology has been limited to 5% or less actual work. Journal of Civil Engineering and Management, 14(2), 73–78. References: Abdelhamid, T. 1440-7027). Cullen, P.

article thumbnail

Cairo & the Built Environment: Past, Present, and Future

Civil + Structural Engineer

By Luke Carothers A Land in Transition Egypt as a place is no stranger to the change that marches hand-in-hand with the progress of time. The legacy of time and change can still be felt throughout Cairo’s built environment. It is a unique place in the world.