Remove 2002 Remove Change Management Remove Schedule Management
article thumbnail

CONSTRUCTION PROJECT FAILURE FACTORS

Job Order Contracting

The real area of befuddlement is why real property owners have not changed the decades old legacy of rampant economic and environmental waste plaguing the AECCO sector (AECOO – Architecture, Engineering, Construction, Owner, Operator). International Journal of Project Management Belout, A., & Gauvreau, C. 1999). (1999).

article thumbnail

Increasing transparency for Copenhagen Metro with Autodesk’s Construction Cloud

Autodesk Construction Cloud

Since opening in 2002, over 1 billion passengers have travelled in the city by Metro. . And since its opening in 2002, the metro has been expanding. The team uses 2D drawings which are printed and manually marked up with changes or issues as well as spreadsheets to manage certain workflows.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

Reduced project related cost growth per change order. Shorter construction schedules than planned. management. Journal of Management in Engineering, 10(6), 26-29. management in the UK construction industry. Management, 6(3), 159-168. International Journal of Project Management, 25(4), 386-393.

article thumbnail

Why Projects Fail

Job Order Contracting

First and foremost is important to understand that all projects are exercises in managing change. The key to consistent delivery of successful projects therefore lies in the ability to account for and/or manage variations as they occur. Senior management failure is the #1 cause of poor project outcomes. Edwards Demming.

article thumbnail

Efficient Construction Project Delivery for Public Sector Facility Owners – Renovation, Repair, Sustainability

Building Information Management

Most larger real property owners manage their assets in an ‘ad hoc’ manner and have little true visibility into requirements, costs, or levels of productivity. JOC is the implementation of robust LEAN best management practices. Better definition, establishment, and attainment/reduction of schedules. 1) Aller, G.

article thumbnail

Revit OpEd: 2012 Central States Revit Workshop - Omaha, Nebraska

Revit OpEd

This is the schedule/agenda for the two day Revitganza. Comments: Comments are moderated to manage spamming. Changing a Username. Revit Consultant - Revit Training, Revit Implementation and Navisworks I started using Revit at work in 2002. If youd like to read their flyer you can download it HERE. Shared Coordinates.

article thumbnail

Revit OpEd: Revit 2013 - View References

Revit OpEd

I don't have 2013 yet, will this work inside a schedule, say for door detail references? Sorry, not in schedules. Comments: Comments are moderated to manage spamming. Can't Change a Parameter from Type to Instance. Scheduling Inequity for Ducts. Labels: News , Revit 2013 , Tips , View Reference. Parameters.