article thumbnail

Cairo & the Built Environment: Past, Present, and Future

Civil + Structural Engineer

This ambitious project–owned by the Egyptian National Authority of Tunnels (NAT)–is intended to create a direct connection between Cairo, the New Administrative Capital, and 6th of October City via a two-line rapid transit system. When completed, this will be the longest driverless monorail system in the world.

article thumbnail

Position Partners’ looks back on 30 years in the industry

Roads Online

Gary Campbell, General Manager for the company’s Integrated Solutions Group, says that Position Partners have held the ability to offer integrated machine systems for years. The system we fitted was worth more than the machinery combined, but it was a prestige golf course, and they wanted their bunkers to be built with precision,” he says.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Measure Between Two References

Revit OpEd

Not much of a catch but there is no equivalent floor in this case. If there was a floor there Id just check the properties of the floor. you could sketch your own a floor around the perimeter pretty quickly. For my money, Id probably favor a floor. Steve - Have you considered mass floors? or you could.

article thumbnail

Michael G. Smith Writes about the Value of Cob

Natural Building

Using simple, low-tech techniques that anyone can learn, clay soil can be turned into walls, floors and plasters with only the addition of sand and straw. While cob, adobe, or rammed earth walls have historically been used to support the weight of roofs and second floors, hybrid designs often include a wooden structural framework.

article thumbnail

Discover the Country with the Fastest Construction Times in the World

Building Radar

Completed on December 17, 2002, this 1,200-square-foot house, with three bedrooms and two bathrooms, was constructed in just 3 hours, 26 minutes, and 34 seconds. The building, with a total floor area of 25,000 square feet, can accommodate up to 600 people. Read about countries leading future construction. million square feet.

article thumbnail

TCC’s judgment in Martlet v Mulalley, a cladding fire safety dispute

Practical Law Construction

It also discovered that the mineral wool fire barriers the system required at each floor level in order to mitigate the risk of fire spread had been defectively installed. Mulalley denied this, maintaining that the cladding system it had installed complied with the applicable standards at the time. The dispute.

article thumbnail

UMI Stone Partners With Vicostone Quartz to Become Exclusive Supplier

CCR Magazine

Exceptional Customer Service: UMI Stone’s proprietary inventory management and integrated customer relationship management systems ensure a seamless experience focused on the highest levels of service from sampling to delivery. </p>