Remove 2002 Remove Flooring Systems Remove Painting/finishing
article thumbnail

Cairo & the Built Environment: Past, Present, and Future

Civil + Structural Engineer

This ambitious project–owned by the Egyptian National Authority of Tunnels (NAT)–is intended to create a direct connection between Cairo, the New Administrative Capital, and 6th of October City via a two-line rapid transit system. When completed, this will be the longest driverless monorail system in the world.

article thumbnail

Revit OpEd: Finish and Cancel Inequity

Revit OpEd

Finish and Cancel Inequity. He mentioned the inconsistency between the way some elements that are sketch based are finished and the way shape editing for floors and roofs finish. Floor, roof, stair or ramp Sketch Creation = Finish and Cancel. Floor, roof, stair or ramp Sketch Creation = Finish and Cancel.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A new chapter for the cherished Louis Latzer Memorial Public Library

The Korte Company

They offer 45,000 items in circulation, from books to astronomy equipment to musical instruments, plus an additional 9 million more through the Illinois Heartland Library System and 75,000 digital downloadable items. The HVAC system needed attention. She wanted new railings and paint for the rear entrance.

article thumbnail

Revit OpEd: Layer Function Setting

Revit OpEd

System families have a Function setting. Thats true for Walls, Floor, Roofs and Ceilings. Finish 1 [4] = Finish Exterior [4]. Finish 2 [5] = Finish Interior [5]. Just a question, I also practice n°4 finish for exterior and n°5 for interior, but for the pure operation of Revit, is there a reason?

article thumbnail

Revit OpEd: Kitchen Equipment - RW Smith BIM Booklet

Revit OpEd

The company recently finished up their BIM Services booklet hosted by Issuu. Wall Floor Interaction and Linked Models. Finish and Cancel Inequity. Revit Consultant - Revit Training, Revit Implementation and Navisworks I started using Revit at work in 2002. It helps them have a meaningful conversation with their clients.

article thumbnail

Revit OpEd: Wall Floor Interaction and Linked Models

Revit OpEd

Wall Floor Interaction and Linked Models. The wall continues past the floor as if it isnt there. I should mention that this works the other direction too, since the reveal is part of the wall it will leave a "hollow" space for the structural models floor slab to occupy. Labels: Collaboration , Floors , Linked Files , Walls.

article thumbnail

Revit OpEd: How Many Worksets Do I Need?

Revit OpEd

Floors Retail. Floors Condos. Floors Rental. Floors Residential. Floors Examination Rooms. Floors Laboratories. I may not want a water heater visible in my HVAC floor plan and the plumbing views probably dont want to see a condensing unit in them. Wall Floor Interaction and Linked Models.