Remove 2002 Remove Risk Management Remove Structural Systems
article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

Performance-centric reward system. management. Journal of Management in Engineering, 10(6), 26-29. management in the UK construction industry. Management, 6(3), 159-168. International Journal of Project Management, 25(4), 386-393. Journal of Construction Engineering and Management, 133(3), 225-234.

article thumbnail

Why Projects Fail

Job Order Contracting

Instead, most of the performance variations are caused by the system, of which those people are but a part. People can’t perform better than the system allows W. Edwards Deming – T he System of Profound Knowledge. First and foremost is important to understand that all projects are exercises in managing change.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: BIM Coordinator for Civil 3D and Revit

Revit OpEd

It allows a Civil 3D user to define the shared coordinate system to be passed on to a Revit project. Note that it uses a file formatted as ACCSXML (Autodesk Consulting Coordinate System eXtensible Markup Language). Comments: Comments are moderated to manage spamming. Working at Risk. Shared Coordinates. Egress Paths.

article thumbnail

Gatic drainage solutions chosen for ambitious ‘futureproof’ logistics facility

Specification Product Update

When work started on Phases 2 and 3, Gatic CastSlot and Gatic Kerbdrain from Alumasc Water Management Solutions (AWMS), were specified due to their unrivalled track record for performance and longevity. Regional Account Manager for AWMS, Michael Taylor, worked closely on the scheme alongside Winvic. This equates to just 1.35

article thumbnail

Gatic drainage solutions chosen for ambitious ‘futureproof’ logistics facility

Specification Product Update

When work started on Phases 2 and 3, Gatic CastSlot and Gatic Kerbdrain from Alumasc Water Management Solutions (AWMS), were specified due to their unrivalled track record for performance and longevity. Regional Account Manager for AWMS, Michael Taylor, worked closely on the scheme alongside Winvic. This equates to just 1.35

article thumbnail

Revit OpEd: Should I Use Revit for this Project?

Revit OpEd

When Revit Systems was released in 2006, the essence of Autodesks marketing commentary was, "this is new software so it probably doesnt make sense to tackle a project with it unless the architecture team is using Revit too." There wasnt a Revit Structure or MEP when Revit was introduced. I dont think it is still true six years later.

article thumbnail

Revit OpEd: Shared Coordinate Post Summary

Revit OpEd

Comments: Comments are moderated to manage spamming. Any reference to Revit, Revit Architecture, Revit MEP or Revit Structure on this site is made acknowledging this ownership. Working at Risk. Revit Consultant - Revit Training, Revit Implementation and Navisworks I started using Revit at work in 2002. Shared Coordinates.