Remove 2003 Remove Lean Construction Remove Procurement Remove Quality Control
article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

The characteristics of strategic collaboration and efficient construction project delivery are discussed below. Integrated planning, procurement, and project delivery processes and team. Characteristics of Strategic Collaboration and Efficient Construction Project Delivery. Shorter construction schedules than planned.

article thumbnail

Job Order Contracting - Untitled Article

Job Order Contracting

Managing the numerous repair, renovation, maintenance, sustainability, and construction projects required for any building or asset portfolio is a daunting task. Since 2003, federal real property was noted as “high risk” by the GAO. The truth is likely that both are to blame.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why Projects Fail

Job Order Contracting

85%+of all projects are over budget (just 31% of all projects came within 10% of the budget in the past 3 years – KPMG) 52% of rework is caused by poor project data and miscommunication (2018 Industry Report – Construction Disconnected, FMI). 40-50% work is either rework or not “value-added work.” COMMON MANAGEMENT FAILURES.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

Facility / Infrastructure Life Cycle Cost: Costs associated with designing, acquiring, constructing, adapting, maintaining, repairing, and operating a built structure. The latter is a process involving the construction and management of physical and functional conditions of a built structure over time. Abdul Lateef A, Olanrewaju.

article thumbnail

DoD FSRM, BUILDER SMS and the LEGACY of Wasteful Politics

Job Order Contracting

released and first version commercially available 2003: NAVY funds development of BUILDER 3.0 (web-based released and first version commercially available 2003: NAVY funds development of BUILDER 3.0 (web-based DoD hasn’t achieved a clean audit since independent audits were initiated in 2017. 2014cv0173-62-0.