Remove 2004 Remove Building Controls Remove Schedule Management
article thumbnail

Long-Term Maintenance Tips for Storm-Damaged Roofs

CCR Magazine

Research indicates that 70 percent of Florida homes had roofs that were ten years old or older when they faced destructive hurricane seasons in 2004-05. Buildings with roofs that are more than 20 years old receive claims that are between 50% to 100% more severe compared to those with recent roof installations. The good news?

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

To meet their responsibilities as stakeholders of the built environment ( facilities and other built structures ), public sector owners need to have the ability create credible construction cost estimate for ALL repair, renovation, maintenance (FSRM), and new build projects.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

2004; Black et al., Shorter construction schedules than planned. All the tools and support services are readily available to enable strategic collaboration and efficient delivery of any type or size of repair, renovation, maintenance, or new build activity. Partnering: a team building approach to quality construction.

article thumbnail

Revit OpEd: Reference Planes and Wall Closure

Revit OpEd

Control Wall’s Material Return. A door or window family has the ability to control the return of materials (i.e. The exterior and interior materials can be controlled separately. A single door family is controlling the various conditions shown below. Builds and Updates. ► 2004. (2). Newer Post.

article thumbnail

3D Printing in Construction: Growth, Benefits, and Challenges

Autodesk Construction Cloud

With 3D printers now capable of printing building walls and processing cement, the technology could help reshape construction as we know it. Prior to the adoption of building information modeling (BIM) , 3D printing was even used by architectural firms to build scale models. Construction took just 17 days. billion by 2024.

article thumbnail

Revit OpEd: Revit 2013 - View References

Revit OpEd

I don't have 2013 yet, will this work inside a schedule, say for door detail references? Sorry, not in schedules. Builds and Updates. Comments: Comments are moderated to manage spamming. Control Grips in Families. Scheduling Inequity for Ducts. ► 2004. (2). ► December 2004. (1).

article thumbnail

Revit OpEd: Chameleon for Grasshopper and Revit

Revit OpEd

It offers a Curtain Grid Manager that controls both panels and grids now, offers a preview of the system as well as helping to distinguish between vertical and horizontal orientations. Builds and Updates. Comments: Comments are moderated to manage spamming. Panel Schedule and Load Calculation Addition. Newer Post.