CONSTRUCTION PROJECT FAILURE FACTORS

Job Order Contracting

The real area of befuddlement is why real property owners have not changed the decades old legacy of rampant economic and environmental waste plaguing the AECCO sector (AECOO – Architecture, Engineering, Construction, Owner, Operator). International Journal of Project Management Belout, A., & Gauvreau, C. 1999). (1999).

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Education, key performance indicators, common terms and definitions, collaborative construction delivery methods, and current, objective, local market granular cost data as well as supporting technology can to be leveraged to enable significant cost savings via signifincant improvements in cost visibility, cost management, and productivity.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

2004; Black et al., Reduced project related cost growth per change order. Shorter construction schedules than planned. management. Journal of Management in Engineering, 10(6), 26-29. management in the UK construction industry. Management, 6(3), 159-168. Management Institute. 2000; Grajek et al.,

article thumbnail

Why Projects Fail

Job Order Contracting

First and foremost is important to understand that all projects are exercises in managing change. The key to consistent delivery of successful projects therefore lies in the ability to account for and/or manage variations as they occur. Senior management failure is the #1 cause of poor project outcomes. Edwards Demming.

article thumbnail

Revit OpEd: 2012 Central States Revit Workshop - Omaha, Nebraska

Revit OpEd

This is the schedule/agenda for the two day Revitganza. Comments: Comments are moderated to manage spamming. Changing a Username. ► 2004. (2). ► December 2004. (1). ► November 2004. (1). ► 2004. (2). ► December 2004. (1). ► November 2004. (1).

article thumbnail

Revit OpEd: Reference Planes and Wall Closure

Revit OpEd

These adjustments change the 3D model, not just the 2D plan-view. Note the two “wall closure” parameters (shown below) need to be “locked” so they stay positive (in the correct direction) when the host wall thickness changes. Comments: Comments are moderated to manage spamming. ► 2004. (2).

article thumbnail

Revit OpEd: Revit 2013 - View References

Revit OpEd

I don't have 2013 yet, will this work inside a schedule, say for door detail references? Sorry, not in schedules. Comments: Comments are moderated to manage spamming. Can't Change a Parameter from Type to Instance. Scheduling Inequity for Ducts. ► 2004. (2). ► December 2004. (1).