Remove 2004 Remove Flooring Systems Remove Roofing Systems
article thumbnail

Revit OpEd: Finish and Cancel Inequity

Revit OpEd

He mentioned the inconsistency between the way some elements that are sketch based are finished and the way shape editing for floors and roofs finish. Floor, roof, stair or ramp Sketch Creation = Finish and Cancel. Floor or roof Shape Editing = Accidentally hitting the escape key and getting kicked out of it.

article thumbnail

Contributing to a New Youth Scout Den in New Zealand

Strong Tie

Simpson Strong-Tie Quik Drive In 2004, Simpson Strong-Tie acquired Quik Drive® fastening systems , a company based in Gallatin, Tennessee, USA. This product range now includes fasteners, mechanical and chemical anchors, lateral systems, powder-actuated tools, and connectors.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Layer Function Setting

Revit OpEd

System families have a Function setting. Thats true for Walls, Floor, Roofs and Ceilings. Wall Floor Interaction and Linked Models. ► 2004. (2). ► December 2004. (1). ► November 2004. (1). Ive also been a part of the consulting team for CDV Systems since 2005. Revit "TIME".

article thumbnail

Lightweight Concrete Sculptural Building

Natural Building

Below is an excerpt from Home Work: Hand Built Shelter (Shelter Publications, 2004) by Lloyd Kahn. Most of the first floor is of adobe construction. Later, additions and roofs were added made of lightweight volcanic aggregate. All roofs are masonry vaults with shell motifs. Designing a smart roof shape is one key.

article thumbnail

Revit OpEd: Wishlist - Families and Hide at Scales Coarser Than

Revit OpEd

It makes it easier to keep certain sections (details/wall sections) and elevations (interior) off of overall floor plan views for example. Related to this is the notion that there are representations that wed like to control for floor plan orientation and offer a different appear for the reflected ceiling plan (RCP) version.

article thumbnail

Revit OpEd: Two Minutes with Beams and Columns

Revit OpEd

Check out [link] Using this same functionality but in conjunction with slab/roof shape edit. Wall Floor Interaction and Linked Models. ► 2004. (2). ► December 2004. (1). ► November 2004. (1). Ive also been a part of the consulting team for CDV Systems since 2005. It's very fun!

article thumbnail

Bright Start, Club Pilates, Glowbar Join Jasper in LIC

CCR Magazine

The new studio will offer residents and community members a wide range of classes and state-of-the-art equipment, including Pilates reformers, chairs, springboard, barre, TRX training systems, and extensive training certification for its instructors. Since its founding in 2004, Domain has been involved in over $2.5