Remove 2004 Remove Painting/finishing Remove Wall Systems
article thumbnail

Revit OpEd: Finish and Cancel Inequity

Revit OpEd

Finish and Cancel Inequity. He mentioned the inconsistency between the way some elements that are sketch based are finished and the way shape editing for floors and roofs finish. Floor, roof, stair or ramp Sketch Creation = Finish and Cancel. Edit Profile = Finish and Cancel. Model Groups = Finish and Cancel.

article thumbnail

A Giant That Is (Still) Creeping Through the Construction Industry: Digitization

Building Radar

Machine learning allows IT systems to improve themselves by independently “learning” from data using statistical methods. 3D Printing In 2004, the University of South Carolina succeeded in building a wall only using 3D printing for the first time – today a house can be printed in 20 hours.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Layer Function Setting

Revit OpEd

System families have a Function setting. Thats true for Walls, Floor, Roofs and Ceilings. Finish 1 [4] = Finish Exterior [4]. Finish 2 [5] = Finish Interior [5]. I run into wall types quite often that have these wrong or inconsistently applied. Wall Floor Interaction and Linked Models.

article thumbnail

Revit OpEd: Reference Planes and Wall Closure

Revit OpEd

Reference Planes and Wall Closure. Control Wall’s Material Return. Layers) for the host wall in a project. Note the two “wall closure” parameters (shown below) need to be “locked” so they stay positive (in the correct direction) when the host wall thickness changes. ► 2004. (2).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. 2004+ Edition. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 01 84 19 Interior Finishes Performance Requirements. Divisions.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. 2004+ Edition. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 01 84 19 Interior Finishes Performance Requirements. Divisions.

article thumbnail

Revit OpEd: Wall Floor Interaction and Linked Models

Revit OpEd

Wall Floor Interaction and Linked Models. When we have architecture and structure in separate Revit models we end up with somewhat clumsy graphics in wall sections. The wall continues past the floor as if it isnt there. Labels: Collaboration , Floors , Linked Files , Walls. Wall Floor Interaction and Linked Models.