Remove 2005 Remove Building Codes Remove Ceiling Systems
article thumbnail

Revit OpEd: Room Separation Lines - Agida for MEP?

Revit OpEd

Further, we are unable to accurately or efficiently create a gbXML file for use in Green Building Studio, HAP, Trace, etc. A zone would wrap up the spaces that are served by a single system as you described. I have done this technique for a shell building with multiple tenant improvements that follow in their own phases.

article thumbnail

Revit OpEd: Wishlist - Families and Hide at Scales Coarser Than

Revit OpEd

Related to this is the notion that there are representations that wed like to control for floor plan orientation and offer a different appear for the reflected ceiling plan (RCP) version. Builds and Updates. Kiwi Codes - Project Browser for 2013. ► 2005. (73). ► December 2005. (7). ► July 2005. (5).

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

Open information exchange of Heating, Ventilating and Cooling systems (HVACie), released by the Engineer Research and Development Center for public review. HVACie extends the existing Industry Foundation Class Coordination View including equipment and system information streamlining construction shop drawing and fabrication.

article thumbnail

Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

Open information exchange of Heating, Ventilating and Cooling systems (HVACie), released by the Engineer Research and Development Center for public review. HVACie extends the existing Industry Foundation Class Coordination View including equipment and system information streamlining construction shop drawing and fabrication.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

OSHA 1910.66, CALOSHA, AISC, AWS and local code requirements. Application: This standard applies to all installed sprinkler systems with nozzles. This work should be scheduled prior to flushing system. Application: This standard applies to all installed flag poles with electric and manual cabling systems. Check Points: 1.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

The architectural scope includes, but is not limited to, demolition and construction of building exteriors and interiors and may include suspended ceilings, gypsum and masonry walls, metal frames and solid core doors, and resilient flooring. This is generally a Photo I.D. Badge for any person(s) on site.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

The core competencies identified include competencies relating to building operations and maintenance, energy management, sustainability, water efficiency, safety (including electrical safety) and building performance measures. Fede ral Buildings Personnel Training Act. The core competencies will be updated annually per the law.