Remove 2005 Remove Building Performance Measurement Remove Electrical Wiring Installation
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Preventive maintenance services should be performed by a qualified manufacturer’s service representative. De-energize, lock out, and tag electrical circuits. Notify affected personnel before performing PM (alarmed or security entrances). Inspect electrical power panel. Examine all wiring, motor, starter, push button, etc.,

article thumbnail

Revit OpEd: Revit 2013 Service Pack 1 Available

Revit OpEd

Just a reminder - with the introduction of Autodesk Revit 2013, make sure you are installing the correct update for your product! The Installation ReadMe files and Update Enhancement PDFs are available at each of these locations as well. Improves performance of opening and closing sketch mode in projects with many families.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Job Order Contracting enables a pre-qualified contractor(s) to perform repair, renovation, or minor construction of a facility or other form of built structure based on pre-described and pre-priced tasks as defined within a Unit Price Book – UPB. Asbestos and similar abatement may also be included if part of an overall project.