Remove 2005 Remove Cost Control Remove Land Use Regulations
article thumbnail

Protecting sensitive sites: Noise and vibration rules

Construction Specifier

By Todd Busch Photo dhvstockphoto/courtesy bigstockphoto.com In the United States and Canada, three places are uniquely regulated by government authorities for construction noise and/or vibration. The regulations require studies before construction activity and/or noise and vibration monitoring during construction.

article thumbnail

Industry Focus: Food Processing – The Process Of Consistency

Business Facilities

Food-related manufacturing is present in many of the public power communities across the state, largely because the communities have a low cost of operation and a wealth of infrastructure to aid in the production process. Moving products from Indiana is both expedient and cost-effective. Indiana Lt.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

Common data environment (glossary of terms and definitions, locally researched detailed unit price cost data). Lower project related cost growth. Projects completed at or under budgeted cost. Reduced project related cost growth per change order. Zero costs associated with disputes and claims. Shared boundaries.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard card applies to automatic hydraulic security Bollards/Barricades found at driveway entrances, and other areas where vehicular traffic must be controlled. Review the Standard Operating Procedure for “Controlling Hazardous Energy Sources”. Inspect control panel for loose connections. Tool Group A.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

the bill is supposed to cut federal government energy costs and train the federal building maintenance work force in the use of high performance technologies for energy conservation in federal buildings.”. kind database that can be used to measure the. Fede ral Buildings Personnel Training Act. Oppor tunity: The web-­?tool