Remove 2006 Remove Building Controls Remove Building Permits
article thumbnail

Prototyping multi-store retail leads to substantial store returns

CCR Magazine

“Our business is built on maximizing cost savings that we pass along to our customers,” says White, who joined ALDI as a District Manager in 1998 before accepting the Director of Real Estate role in 2006. White says its model is different by design. "At

article thumbnail

The Bronx Vibe, a New, 155-residence, Luxury Rental Development

CCR Magazine

“I want to thank Bronx 161 LLC, IMC Architecture, Classic Image, Bohemia Realty Group and Ray Builders for their work on this project, and we look forward to welcoming tenants to this building.” “We The building offers incredible amenities, including a co-working space, outdoor terraces, and 47 affordable units.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Top 6 Most Dangerous Construction Activities

Safety Services Company

The first step towards electrical safety is controlling or eliminating factors in your workplace that pose electrical hazards. Following the injury trend in construction, the number of such deaths reached 470 in 2006 and dropped to 271 in 2010 [2]. workers that enter permitted confined spaces annually? Confined Space Entry.

article thumbnail

Revit OpEd: Revit 2013 - Sunshine

Revit OpEd

If we advance a single frame at a time it permits us to capture a view with the sun in the view, like this. Builds and Updates. Control Grips in Families. ► 2006. ► December 2006. (14). ► October 2006. (5). ► September 2006. (10). ► August 2006. (8). Newer Post.

article thumbnail

Time to split? Signing deeds during a pandemic

Practical Law Construction

Section 44(2) of the Companies Act 2006 states: “A document is validly executed by a company [as a deed] if it is signed on behalf of the company—. (a) Execute pursuant to section 44(2)(b), Companies Act 2006. In the meantime, we can expect e-signature platforms to build on last year’s momentum. Why does it matter?

article thumbnail

Roof Storm Damage Checklist | What to Do After a Storm on Roof | Types of Roof Storm Damage | Roof Storm Damage Checklist

CivilJungle

Date of Last Roofing Permit. Date of Last Roofing Permit. Lodgment category cost for building consent is 4A with an additional inspection of ½ hour. Building Consent No. Building Consent Application Form completed and signed. Roofing is defined as “restricted building work”. Dutch Gable Roof. Pavillion Roof.

article thumbnail

Less Is More In New England

Business Facilities

The strategy approved in 2006 encouraged major changes to process and policy, and also focused on making incremental improvements. Similar to other New England historic mill towns, the city had suffered from disinvestment in infrastructure and buildings, depressing property values and losing foot traffic. Gregory Chiklis, PhD.,