Remove 2006 Remove Building Controls Remove Painting/finishing
article thumbnail

Behind the Build: Interview with Chad Demick, BIM Manager at Control Air Enterprises

Autodesk Construction Cloud

Starting out as a Local 105 Sheet Metal Worker, Chad Demick has grown from working in the field to becoming BIM Manager at Control Air Enterprises. We recently sat down with Chad to talk about his journey in the industry and his role at Control Air Enterprises. One division, Optimum Energy Design (OED), will design buildings too.

article thumbnail

Revit OpEd: Reference Planes and Wall Closure

Revit OpEd

Control Wall’s Material Return. A door or window family has the ability to control the return of materials (i.e. The exterior and interior materials can be controlled separately. A single door family is controlling the various conditions shown below. Builds and Updates. ► 2006. Newer Post.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: A Small Collection of Family Editor Advice

Revit OpEd

I included the following tips and advice (edited a little in this version) in a door tutorial I wrote for my Autodesk University 2005 lab called "Autodesk Revit Building Family Editor: From the Beginning". Reference planes dont have real endpoints, they are infinite in length but have grips so we can control how much we have to see.

article thumbnail

Revit OpEd: How Many Worksets Do I Need?

Revit OpEd

Recently I was working with a team, their building is a million square feet overall, and opening the whole file took considerably longer than selectively focusing on a single sectors workset. Building Shell or Envelope. Is this part of the building separated obviously from another part and could easily be grouped separately?

article thumbnail

New lifts revealed at Asticus building

Specification Product Update

The Asticus London building, a striking ten-storey landmark, has undergone a remarkable transformation. The building prioritises inclusivity with the new lifts providing daily step-free access. The Client The re-imagined Asticus building was acquired in 2016 by AXA IM Alts, a global leader in alternative investments.

Lifts 52
article thumbnail

Revit OpEd: Revit 2013 - Content Folders

Revit OpEd

We could use filters to exclude them just as easily with more graphic control as well. Builds and Updates. Finish and Cancel Inequity. ► 2006. ► December 2006. (14). ► October 2006. (5). ► September 2006. (10). ► August 2006. (8). ► July 2006. (6).

article thumbnail

Managing moisture in construction: Effective strategies for durable roofing systems

Construction Specifier

The construction process and various finishing activities, such as pouring concrete, or dry wall finishing, can generate large amounts of moisture. thick concrete floor slab poured in an enclosed building generates about 908 L (240 gal) water per 93 m 2 (1,000 sf) of concrete. A 102-mm (4-in.)-thick