Remove 2006 Remove Building Information Modeling (BIM) Remove HVAC Systems Remove Project Management
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Thursday: Information Exchanges.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Thursday: Information Exchanges.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: View Discipline

Revit OpEd

It was meant to make it simple to alter the appearance of our model to be more in sync with what a structural engineer wants to see. When MEP (Systems as it was called then) appeared a year later they extended the concept to Mechanical and Electrical (plumbing lumped in with Mechanical till release 2013).

article thumbnail

Revit OpEd: How Many Worksets Do I Need?

Revit OpEd

The whole model is still there, just not visible, thatll provide some relief for performance sake. How tangible or detectable that performance gain really is will depend greatly on the scope of your project. This means each project should have its own workset structure based on its own conditions. Building Shell or Envelope.