Remove 2006 Remove Ceiling Systems Remove Flooring Systems Remove Schedule Management
article thumbnail

The Bronx Vibe, a New, 155-residence, Luxury Rental Development

CCR Magazine

“The collaborative effort of IMC Architecture , Classic Image and Ray Builders resulted in the development’s completion ahead of schedule and under budget, a very rare achievement in New York,” continued Weiss. In addition to the game room, the 12th floor includes a well-equipped fitness center that features western views.

article thumbnail

Revit OpEd: Layer Function Setting

Revit OpEd

System families have a Function setting. Thats true for Walls, Floor, Roofs and Ceilings. Comments: Comments are moderated to manage spamming. Delete Sheets In Browser or Schedules. Wall Floor Interaction and Linked Models. ► 2006. ► December 2006. (14). ► October 2006. (5).

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Delete Sheets In Browser or Schedules

Revit OpEd

Delete Sheets In Browser or Schedules. Rooms and areas can be deleted in model views like floor plans and ceiling plans. Revit warns us that they have been deleted from the model but they are still listed in schedules. To really delete them we have to open a schedule view and delete them there. Whadya think?

article thumbnail

Revit OpEd: Wishlist - Families and Hide at Scales Coarser Than

Revit OpEd

It makes it easier to keep certain sections (details/wall sections) and elevations (interior) off of overall floor plan views for example. Related to this is the notion that there are representations that wed like to control for floor plan orientation and offer a different appear for the reflected ceiling plan (RCP) version.

article thumbnail

Revit OpEd: Revit 2013 - View Types

Revit OpEd

This means you can create your own versions of floor plans according to discipline or perhaps design phase. Tip: Theyve added View Template to the available fields in View Lists (schedule) so it can be managed there too. Comments: Comments are moderated to manage spamming. of Echo - Don't use the Basic Ceiling.

article thumbnail

Managing moisture in construction: Effective strategies for durable roofing systems

Construction Specifier

Left unaddressed, this moisture can migrate into various areas of the structure, including into the roofing system, leaving materials wet and deteriorating. thick concrete floor slab poured in an enclosed building generates about 908 L (240 gal) water per 93 m 2 (1,000 sf) of concrete. A 102-mm (4-in.)-thick

article thumbnail

Revit OpEd: Room Separation Lines - Agida for MEP?

Revit OpEd

They were however using them for the room finish schedules. Area plans could help document such things but then floor plans would be "ignorant" of what these kinds of "areas" are, no tagging possible, just "dumb text". A zone would wrap up the spaces that are served by a single system as you described. Not ideal either.