Remove 2006 Remove Ceiling Systems Remove Painting/finishing
article thumbnail

Revit OpEd: Reference Planes and Wall Closure

Revit OpEd

Labels: Exteriors , Finishes , Interiors , Materials , Tips , Wall Closure. Moving Ceiling Grid Pattern. ► 2006. ► December 2006. (14). ► October 2006. (5). ► September 2006. (10). ► August 2006. (8). ► July 2006. (6). ► June 2006. (13).

article thumbnail

Revit OpEd: Layer Function Setting

Revit OpEd

System families have a Function setting. Thats true for Walls, Floor, Roofs and Ceilings. Finish 1 [4] = Finish Exterior [4]. Finish 2 [5] = Finish Interior [5]. Just a question, I also practice n°4 finish for exterior and n°5 for interior, but for the pure operation of Revit, is there a reason?

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Revit 2013 Service Pack 1 Available

Revit OpEd

Allows exporting of materials painted on elements to ODBC. Corrects the display of the materials category within the Paint interface. Improves stability when splitting pipes which belong to different systems. Improves consistency of adding circuits to equipment that are connected to a pipe or duct system. ► 2006.

article thumbnail

Revit OpEd: Room Separation Lines - Agida for MEP?

Revit OpEd

They were however using them for the room finish schedules. A zone would wrap up the spaces that are served by a single system as you described. They did this w/o also carrying over an additional piece of the puzzle which is a check box for is "Space Bounding" for elements such as walls, ceilings etc. ► 2006.

article thumbnail

Revit OpEd: Delete Sheets In Browser or Schedules

Revit OpEd

Rooms and areas can be deleted in model views like floor plans and ceiling plans. Finish and Cancel Inequity. ► 2006. ► December 2006. (14). ► October 2006. (5). ► September 2006. (10). ► August 2006. (8). ► July 2006. (6). ► June 2006. (13).

article thumbnail

Managing moisture in construction: Effective strategies for durable roofing systems

Construction Specifier

The construction process and various finishing activities, such as pouring concrete, or dry wall finishing, can generate large amounts of moisture. Left unaddressed, this moisture can migrate into various areas of the structure, including into the roofing system, leaving materials wet and deteriorating.

article thumbnail

Acoustic panels reduce excessive barking noise in dog shelters keeping animals calmer

Construction Specifier

The normally hard surfaces used for walls, floors and ceilings can create an echo chamber where one dog’s barking can reverberate throughout the entire facility. If windows or other wall obstacles are present, panels can also be installed on the wall behind the cages or on the ceiling. m in length and painted to match any room décor.