article thumbnail

What lifetime support means to us

CK Power

We discuss the best system for their operations, then design and build a unit around their needs. Our knowledgeable service providers also perform regular system checkups every 250 hours to keep generators out of the graveyard. Our larger customers receive a dedicated technician who will get to know them and their power system.

article thumbnail

Revit OpEd: Which Overwrite is Right

Revit OpEd

The first button is effectively acknowledging the changed family but preserving values that we may have entered or altered in the project, they may be different from the original family. Ive seen confusion with this result in uncomfortable changes. This kind of change should have been done with the "first choice". ► 2006.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: View Discipline

Revit OpEd

When MEP (Systems as it was called then) appeared a year later they extended the concept to Mechanical and Electrical (plumbing lumped in with Mechanical till release 2013). When Mechanical is assigned Revit changes the nature of what plan and reflected plan mean. Electrical - Same as Mechanical.

article thumbnail

Off-highway primary power through the tiers

CK Power

Operators will tell you things have changed a lot over the past decade. When new regulations come down the pipe, owners and fleet managers ask: “Do we need all new equipment, or can old units be updated?”. Tier 3 was rolled out from 2006 to 2008, placing additional restrictions on exhaust fumes for engines ranging from 37 to 560 kW.

article thumbnail

Revit OpEd: Due Diligence

Revit OpEd

The problems are with autodesk's management of the software and of the paying client base, who are always secondary to the shareholders. How many revit 2013 changes (I can't call them all improvements) address AUGI wishlist items? I think we're just at the beginning of massive change in the industry. The soluton?

article thumbnail

Revit OpEd: Measure Between Two References

Revit OpEd

In addition, I can use the grips of the mass to adjust the perimeter if I need to and the floor area dynamically changes. Comments: Comments are moderated to manage spamming. Revit MEP Electrical Calculations. ► 2006. ► December 2006. (14). ► October 2006. (5). ► September 2006. (10).

article thumbnail

Revit OpEd: Revit 2013 Service Pack 1 Available

Revit OpEd

A few changes have been made this year as to how the updates are accessed. Improves stability when splitting pipes which belong to different systems. Improves consistency of adding circuits to equipment that are connected to a pipe or duct system. Comments: Comments are moderated to manage spamming. ► 2006.