Remove 2006 Remove Electrical Systems Remove Painting/finishing Remove Wall Systems
article thumbnail

The Bronx Vibe, a New, 155-residence, Luxury Rental Development

CCR Magazine

The yard’s 2,300-square foot partial green roof tray system, which was supplied by Columbia Green Technologies, was delivered as a modular pre-grown tray system and includes active and passive landscaping sections, making this space a green oasis. The other three sides of the building feature an EIFS finish.”

article thumbnail

Skilled labor shortage amplifies need to boost vocational education

The Korte Company

We can see the writing on every wall we put up: The underlying driver of today’s skilled labor shortage has not been adequately addressed, so the gap between available workers and construction demand is sure to widen. And yet, school systems still devalue vocational education as a matter of policy. And it’s far from guaranteed.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Revit 2013 Service Pack 1 Available

Revit OpEd

Allows exporting of materials painted on elements to ODBC. Improves stability when selecting a new host for an element within an In-place Wall. Corrects the display of the materials category within the Paint interface. Improves creation consistency with Physical Wall when coping an Analytical Model Wall.

article thumbnail

Managing moisture in construction: Effective strategies for durable roofing systems

Construction Specifier

The construction process and various finishing activities, such as pouring concrete, or dry wall finishing, can generate large amounts of moisture. Left unaddressed, this moisture can migrate into various areas of the structure, including into the roofing system, leaving materials wet and deteriorating.

article thumbnail

Revit OpEd: Reference Planes and Wall Closure

Revit OpEd

Reference Planes and Wall Closure. Control Wall’s Material Return. Layers) for the host wall in a project. Note the two “wall closure” parameters (shown below) need to be “locked” so they stay positive (in the correct direction) when the host wall thickness changes. ► 2006.

article thumbnail

Revit OpEd: Revit 2013 - Content Folders

Revit OpEd

Revit MEP users are used to all the electrical content being located under a single folder and then broken down by usage. Now well find Electrical and Lighting and these are further broken down by Architectural and MEP. Wall Floor Interaction and Linked Models. Finish and Cancel Inequity. ► 2006.

article thumbnail

Revit OpEd: Room Separation Lines - Agida for MEP?

Revit OpEd

They were however using them for the room finish schedules. If room separation lines are "off the table" then the architect would end up using something else like actual walls and hiding them. When we unload a workset the walls are still there and that means so are Room Separation lines. Regarding the workset comments.