Remove 2006 Remove Flooring Systems Remove HVAC Systems
article thumbnail

New Heating Units Offer Cost-Effective Comfort in Boston Apts

CCR Magazine

QMarkĀ® MUH-Pro+ and CU900 electric heaters with SmartSeriesĀ® Plus (SSP) digital BACnet thermostats from Goodyear HVAC Sales proved to be the ideal solution. Since opening in 2006, the building needed to address issues with its HVAC systems and controls, which were leading to high monthly electric bills. The culprit?

article thumbnail

Managing moisture in construction: Effective strategies for durable roofing systems

Construction Specifier

Left unaddressed, this moisture can migrate into various areas of the structure, including into the roofing system, leaving materials wet and deteriorating. thick concrete floor slab poured in an enclosed building generates about 908 L (240 gal) water per 93 m 2 (1,000 sf) of concrete. A 102-mm (4-in.)-thick

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: View Discipline

Revit OpEd

When MEP (Systems as it was called then) appeared a year later they extended the concept to Mechanical and Electrical (plumbing lumped in with Mechanical till release 2013). A HVAC plan is different because most engineers want to see the highest duct masking lower ducts. The concept of View Discipline appeared with Revit Structure.

article thumbnail

Revit OpEd: Room Separation Lines - Agida for MEP?

Revit OpEd

The essence of my response via email: HVAC Zones are meant to combine spaces into larger more coherent collections for engineering purposes. From the HVAC engineers perspective irrelevant but not from the clients or the architect trying to satisfy them. ► 2006. ► December 2006. (14). ► October 2006. (5).

article thumbnail

Revit OpEd: How Many Worksets Do I Need?

Revit OpEd

Floors Retail. Floors Condos. Floors Rental. Floors Residential. Floors Examination Rooms. Floors Laboratories. I may not want a water heater visible in my HVAC floor plan and the plumbing views probably dont want to see a condensing unit in them. Wall Floor Interaction and Linked Models.

article thumbnail

Roof Storm Damage Checklist | What to Do After a Storm on Roof | Types of Roof Storm Damage | Roof Storm Damage Checklist

CivilJungle

If your roof has not had a proper drainage system, then you must face the issue of standing water problem. Domestic smoke alarm(s) detailed on floor plan (Refer to NZBC F7 for requirements within 3m of sleeping areas and on escape route of each level). Notify/schedule HVAC reconnect. Standing Water. to boundary etc.