Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

Open information exchange of Heating, Ventilating and Cooling systems (HVACie), released by the Engineer Research and Development Center for public review. HVACie extends the existing Industry Foundation Class Coordination View including equipment and system information streamlining construction shop drawing and fabrication.

article thumbnail

Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

Open information exchange of Heating, Ventilating and Cooling systems (HVACie), released by the Engineer Research and Development Center for public review. HVACie extends the existing Industry Foundation Class Coordination View including equipment and system information streamlining construction shop drawing and fabrication.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Thursday: Information Exchanges.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Thursday: Information Exchanges.

article thumbnail

40 Under 40: Champions of Construction 2022

Autodesk Construction Cloud

Danielle O’Connell, Skanska USA Building Inc. Chris Walker, The PENTA Building Group. Mechanical Engineer & Project Manager, AKF Group. As Mechanical Engineer & Project Manager, Jason oversees the implementation of digital platforms in a multi-building and multi-phase project. Maggie Farrell, S.

article thumbnail

Revit OpEd: Room Separation Lines - Agida for MEP?

Revit OpEd

These divisions, while relevant to the architectural model, are ruining the possibilities of creating gbXML files without extensive work on the part of the engineer to remove the room separation lines, and then repair the damage done to the room names and numbers. They were however using them for the room finish schedules. 2:29 AM.

article thumbnail

Revit OpEd: How Many Worksets Do I Need?

Revit OpEd

The whole model is still there, just not visible, thatll provide some relief for performance sake. Recently I was working with a team, their building is a million square feet overall, and opening the whole file took considerably longer than selectively focusing on a single sectors workset. Building Shell or Envelope. Wing South.