Remove 2008 Remove Flooring Systems Remove Painting/finishing
article thumbnail

Light at the End of the Tunnel

Civil + Structural Engineer

In fact, the storm drain system is about 100 years old. Minneapolis development combined with increased rainfall brings more water into the system, which heightens the pressure on the tunnel. Despite the recent growth, some of the citys underground infrastructure is not so new. Michael, Minnesota, won the bid for the job.

article thumbnail

Revit OpEd: Finish and Cancel Inequity

Revit OpEd

Finish and Cancel Inequity. He mentioned the inconsistency between the way some elements that are sketch based are finished and the way shape editing for floors and roofs finish. Floor, roof, stair or ramp Sketch Creation = Finish and Cancel. Floor, roof, stair or ramp Sketch Creation = Finish and Cancel.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Happy Birthday Revit

Revit OpEd

Wall Floor Interaction and Linked Models. Finish and Cancel Inequity. ► 2008. ► December 2008. (16). ► November 2008. (17). ► October 2008. (35). ► September 2008. (49). ► August 2008. (34). ► July 2008. (32). ► June 2008. (32).

article thumbnail

Revit OpEd: Kitchen Equipment - RW Smith BIM Booklet

Revit OpEd

The company recently finished up their BIM Services booklet hosted by Issuu. Wall Floor Interaction and Linked Models. Finish and Cancel Inequity. ► 2008. ► December 2008. (16). ► November 2008. (17). ► October 2008. (35). ► September 2008. (49). ► 2007. (77).

article thumbnail

Revit OpEd: Layer Function Setting

Revit OpEd

System families have a Function setting. Thats true for Walls, Floor, Roofs and Ceilings. Finish 1 [4] = Finish Exterior [4]. Finish 2 [5] = Finish Interior [5]. Just a question, I also practice n°4 finish for exterior and n°5 for interior, but for the pure operation of Revit, is there a reason?

article thumbnail

Revit OpEd: Reference Plane IsReference Parameter

Revit OpEd

Not finished apparently. Wall Floor Interaction and Linked Models. Finish and Cancel Inequity. ► 2008. ► December 2008. (16). ► November 2008. (17). ► October 2008. (35). ► September 2008. (49). ► August 2008. (34). ► July 2008. (32).

article thumbnail

Revit OpEd: Workset Posts Summary

Revit OpEd

Wall Floor Interaction and Linked Models. Finish and Cancel Inequity. ► 2008. ► December 2008. (16). ► November 2008. (17). ► October 2008. (35). ► September 2008. (49). ► August 2008. (34). ► July 2008. (32). ► June 2008. (32).