Remove 2008 Remove Roofing Systems Remove Wall Systems
article thumbnail

Architects and Contractors Win Awards for Copper in Architecture

Civil + Structural Engineer

The work of these architects and building professionals shows why copper’s adaptability sets the highest standard for sustainable roofs, cornices, cladding, wall systems, and decorative ornamentation.” “Copper fulfills an amazing variety of practical and aesthetic functions. with metal work by Exterior Sheet Metal, Inc.

article thumbnail

AISI Publishes “Thermal Design and Code Compliance Guide for C-Shape Cold-Formed Steel Framing in Building Envelopes”

Civil + Structural Engineer

They will also be able to determine the level of performance in an energy code or high-performance rating system. Larson noted that AISI D250-23 is an update of the “Thermal Design Guide for Exterior Walls” originally published by AISI that was updated and revised in 2008 and 2015.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Stay code-compliant with AISI’s thermal design guide

Construction Specifier

They will also be able to determine the level of performance in an energy code or high-performance rating system. Larson notes AISI D250-23 is an update of the “Thermal Design Guide for Exterior Walls” originally published by AISI that was updated and revised in 2008 and 2015.

article thumbnail

Reopening The Glass House with National Historic Trust

CCR Magazine

Closed to the public since 2008 due to ongoing damage from water infiltration, its closing left half of the property’s core architectural story untold. And, with failures of the flat roof and skylights, the building damage had been extensive. The National Trust has invested $1.8 Koch Theater) at Lincoln Center.

article thumbnail

Revit OpEd: Layer Function Setting

Revit OpEd

System families have a Function setting. Thats true for Walls, Floor, Roofs and Ceilings. I run into wall types quite often that have these wrong or inconsistently applied. Wall Floor Interaction and Linked Models. ► 2008. ► December 2008. (16). ► November 2008. (17).

article thumbnail

Revit OpEd: Finish and Cancel Inequity

Revit OpEd

He mentioned the inconsistency between the way some elements that are sketch based are finished and the way shape editing for floors and roofs finish. Floor, roof, stair or ramp Sketch Creation = Finish and Cancel. Floor or roof Shape Editing = Accidentally hitting the escape key and getting kicked out of it. ► 2008.

article thumbnail

Revit OpEd: Revit 2013 - Sunshine

Revit OpEd

Party Wall Doors. Five Minutes of Roof Sloping. ► 2008. ► December 2008. (16). ► November 2008. (17). ► October 2008. (35). ► September 2008. (49). ► August 2008. (34). ► July 2008. (32). ► June 2008. (32). ► May 2008. (7).