Remove 2009 Remove Building Codes Remove Building Permits
article thumbnail

#115:  Ushering In the New Building Codes

NH Construction Law

Every three years the International Code Council updates its building codes, which eventually become the basis for codes adopted by the states. From September of 2019 until now, the 2015 versions have been incorporated into New Hampshire’s state building code, RSA 155-A. That has just changed.

article thumbnail

#80: Transitioning to the New Building Codes

NH Construction Law

The ICC updates its proposed codes every three years (there is already a 2018 version published), and New Hampshire is finally catching up to other New England states. of the 2015 International Building Code and Section 106.3.2 of the 2015 International Building Code and Section 106.3.2 Section 107.3.2

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Exterior cavity fireblocking: Exceeding fire performance

Construction Specifier

and Steven Gaynor, MBA Photo courtesy Tenmat New York City recently became the first jurisdiction in the country to reject and rewrite major sections of the International Building Code’s ( IBC ’s) language around fire protection in exterior facades. For decades, buildings have relied on intumescent materials for fire control.

article thumbnail

#68:? Energy Code Compliance

NH Construction Law

On June 12, 2018, Governor Sununu signed into law House Bill 1472 , repealing the state code for energy conservation in new construction ( RSA 155-D ) effective August 7, 2018. As with RSA 155-D, the 2009 IECC -- the version currently in effect in New Hampshire -- has different rules for residential and commercial buildings.

article thumbnail

Earthbag Tiny Home Building

Natural Building

Here is an article by Morgan Caraway recently published in www.motherearthnews.com My wife, Mary Jane, and I built our first earthbag home in 2009, after being inspired by the Mother Earth News book Earthbag Building. The build took us less than five months, and the total cost was under $5,000. Use due caution.

article thumbnail

Revit OpEd: Egress Path Options

Revit OpEd

Ideal we should be able to provide a total length of travel from one place to an exit, identify the length of any segment of the path and provide a clear descriptive way to show how our design meets codes in plan views, at a minimum. Builds and Updates. ► 2009. ► December 2009. (16). ► November 2009. (23).

article thumbnail

Revit OpEd: Revit 2013 - Sunshine

Revit OpEd

If we advance a single frame at a time it permits us to capture a view with the sun in the view, like this. Builds and Updates. Kiwi Codes - Project Browser for 2013. ► 2009. ► December 2009. (16). ► November 2009. (23). ► October 2009. (29). ► September 2009. (42).