article thumbnail

The Best Tool for Reaching Net-Zero in Construction? Improved Communication

In Eight

Of those organisations, 63% cite gaps in stakeholder communication, and 60% recognise non-standardised systems and processes affecting that final delivery. Proposed in 2009, HS2 was initially estimated to cost $45.6 Naturally, in 2009, we could never anticipate a global pandemic and the disruption it caused.

article thumbnail

The growing demand for transparency in buildings

Construction Specifier

This includes building controls, lighting, electrical and digital infrastructure, audio/visual (A/V), and other aspects of the structure. The demand for high-performance building controls, lighting, electrical, and digital infrastructure is rising. There are currently three active versions of LEED: v3 (2009), v4, and v4.1,

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Exterior cavity fireblocking: Exceeding fire performance

Construction Specifier

These applications range from fireproofing of structural steel, through-penetration firestopping of mechanical and electrical service, perimeter edge sealing of fire doors, to joint and gap sealing to limit fire spread. For decades, buildings have relied on intumescent materials for fire control.

article thumbnail

Rammed Earth Hospital in Nepal

Natural Building

Bayalpata was started in 2009, and took over a defunct government hospital to show that accessible and free medical care was possible in a rural Nepal district that had the highest maternal and child mortality and lowest lifespan. “Our ‘A great example of an architect listening closely and responding intelligently to site and situation.

article thumbnail

5 Best Full Brim Hard Hat

Work Gearz

MSA Skullgard 475407 Phenolic poly resin 3 suspension systems available – Type I, Class G. IMPACT PROTECTION: Full brim hard hat features a smooth crown design to deflect falling objects; the SuperEight Impact Energy Control System dissipates impacts by spreading the force over a wider area. 2009 Type 1, Class E.

article thumbnail

6 Best Construction Hard Hats (Comfortable, Safe and Durable)

Work Gearz

This accessory is truly important for professionals who are at risk of falling debris, stones, objects, electric shock, or rain. 2009, type I, class C requirements. 6 point suspension system with polyester textile straps offers unrivaled comfort without compromising performance. Structural strength and durability.

article thumbnail

Revit OpEd: Electrical Panel Load Calculations

Revit OpEd

Electrical Panel Load Calculations. Another "inside" gem from Inside the System which offers deeper insight to how the numbers work. If you are a Revit MEP user and electrical is your game, then youll want to read it. of Echo , Electrical , Panel Reports. Electrical Panel Load Calculations. ► 2009.