Remove 2009 Remove Flooring Systems Remove Painting/finishing Remove Schedule Management
article thumbnail

Revit OpEd: Finish and Cancel Inequity

Revit OpEd

Finish and Cancel Inequity. He mentioned the inconsistency between the way some elements that are sketch based are finished and the way shape editing for floors and roofs finish. Floor, roof, stair or ramp Sketch Creation = Finish and Cancel. Floor, roof, stair or ramp Sketch Creation = Finish and Cancel.

article thumbnail

Revit OpEd: Layer Function Setting

Revit OpEd

System families have a Function setting. Thats true for Walls, Floor, Roofs and Ceilings. Finish 1 [4] = Finish Exterior [4]. Finish 2 [5] = Finish Interior [5]. Just a question, I also practice n°4 finish for exterior and n°5 for interior, but for the pure operation of Revit, is there a reason?

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Delete Sheets In Browser or Schedules

Revit OpEd

Delete Sheets In Browser or Schedules. Rooms and areas can be deleted in model views like floor plans and ceiling plans. Revit warns us that they have been deleted from the model but they are still listed in schedules. To really delete them we have to open a schedule view and delete them there. Wednesday, April 25, 2012.

article thumbnail

Revit OpEd: Kitchen Equipment - RW Smith BIM Booklet

Revit OpEd

The company recently finished up their BIM Services booklet hosted by Issuu. Comments: Comments are moderated to manage spamming. Delete Sheets In Browser or Schedules. Wall Floor Interaction and Linked Models. Finish and Cancel Inequity. ► 2009. ► December 2009. (16). ► July 2009.

article thumbnail

Revit OpEd: Wall Floor Interaction and Linked Models

Revit OpEd

Wall Floor Interaction and Linked Models. The wall continues past the floor as if it isnt there. I should mention that this works the other direction too, since the reveal is part of the wall it will leave a "hollow" space for the structural models floor slab to occupy. Labels: Collaboration , Floors , Linked Files , Walls.

article thumbnail

Revit OpEd: Happy Birthday Revit

Revit OpEd

Comments: Comments are moderated to manage spamming. Delete Sheets In Browser or Schedules. Wall Floor Interaction and Linked Models. Finish and Cancel Inequity. ► 2009. ► December 2009. (16). ► November 2009. (23). ► October 2009. (29). ► September 2009. (42).

article thumbnail

Revit OpEd: Reference Plane IsReference Parameter

Revit OpEd

Not finished apparently. Comments: Comments are moderated to manage spamming. Delete Sheets In Browser or Schedules. Wall Floor Interaction and Linked Models. Finish and Cancel Inequity. ► 2009. ► December 2009. (16). ► November 2009. (23). ► October 2009. (29).