Remove 2009 Remove Flooring Systems Remove Wall Systems
article thumbnail

Cintec in North America Announces their Cintec Anchoring System was used in helping Repair the Helmsley Building 230 Park Avenue, NYC

Civil + Structural Engineer

The Problem : By 2009, the building had begun to show its age. At the top of the building some of the twenty-six east and south facing Terra-Cotta columns [ with the base starting at the 26th floor and extending past the 34th floor] had begun to show cracking and in some areas had began to shed large pieces of stone.

article thumbnail

How to Build Healthy Homes That Protect Homebuyers From Radon

The Pro Builder

How to Build Healthy Homes That Protect Homebuyers From Radon ibush Mon, 07/03/2023 - 17:25 Consider a relatively simple and inexpensive passive mitigation system to vent radon—a radioactive, odorless, invisible gas—and deliver a truly healthy home Andrew Shipp A silent poison, a fatal gas, an invisible killer.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Berkeley Place

UK Construction Blog

Berkeley Place was founded by Nick Cryer in Summer 2009, initially targeting independent schools and prestigious residential development opportunities. Pairing an upgraded boiler with upgrading the heating systems and installing intelligent controls/thermostatic radiator valves can help save on energy and improve the rating.

article thumbnail

Stadiums Can Keep Emergency Communications Out of the “Dead Zone”

CCR Magazine

Pre-cast walls, pipes, rebar or structural steel can also disrupt communication, which can be prevalent in areas such as stairwells or tunnels. Signal failure in any critical area will require installing an Emergency Responder Communication Enhancement Systems (ERCES),” says Deron Bone, president of RF DAS Systems, Inc.,

article thumbnail

Exterior cavity fireblocking: Exceeding fire performance

Construction Specifier

Aiming to enhance the fire safety standards in exterior walls, fireblocking is now mandatory behind ventilated cladding , with few exceptions. Simultaneously, it enables the design of exterior walls which can meet the other stringent performance requirements imposed on today’s buildings. By Antonie Habellion, P.Eng., from the 2000 IBC.

article thumbnail

Read About the Latest News on Construction Cost Stabilize, Submarine Construction Facility in Mobile, and US Army Engineers

Construction Daily News

Option 3 includes “construction of the lock floor, installation of the mechanical and electrical systems, completion of the filling and emptying system, placing soil in between the New Lock and old Davis Lock, and commissioning of the lock chamber,” according to Inland Navigation Design Center and New Lock at the Soo technical lead Darin White.

article thumbnail

High-performance coating systems

Construction Specifier

Its aluminum-clad exterior was refinished with a polyvinylidene fluoride (PVDF) based coating system, restoring the building’s façade to a just-like-new condition designed to last for over 20 years. Thin, shallow, reverse mullion profiles made the curtain wall appear as one continuous surface. Preserving modern history.