article thumbnail

Cintec in North America Announces their Cintec Anchoring System was used in helping Repair the Helmsley Building 230 Park Avenue, NYC

Civil + Structural Engineer

The Problem : By 2009, the building had begun to show its age. The property strategically straddles Park Avenue at 46th Street and offers a direct connection to Grand Central Station. It was acquired (2007) for One Billion One Hundred and Fifty Million USD.

article thumbnail

Western Specialty Restores Terrace at Mondial River West, Chicago

CCR Magazine

Located at 910 W Huron Street, the 15-story apartment complex was built in 2009 and has 141 units. In the winter, freeze and thaw cycles can cause big problems with outdoor concrete structures, such as terraces. The system included a base coat with membrane reinforcement, followed by an intermediate and topcoat application.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

To meet their responsibilities as stakeholders of the built environment ( facilities and other built structures ), public sector owners need to have the ability create credible construction cost estimate for ALL repair, renovation, maintenance (FSRM), and new build projects.

article thumbnail

Keep Emergency Communication Out of the “Dead Zone”

CCR Magazine

In-building radio signals are often absorbed or blocked by structures that are larger, underground, or constructed of concrete or metal. Additionally, building features designed to create more sustainable facilities such as low-E glass windows can attenuate the signal from public safety radio systems.

article thumbnail

Stadiums Can Keep Emergency Communications Out of the “Dead Zone”

CCR Magazine

In-building radio signals are often blocked or attenuated by structures that are large and primarily constructed of metal and concrete and with below grade areas. Pre-cast walls, pipes, rebar or structural steel can also disrupt communication, which can be prevalent in areas such as stairwells or tunnels.

article thumbnail

The Best Tool for Reaching Net-Zero in Construction? Improved Communication

In Eight

Of those organisations, 63% cite gaps in stakeholder communication, and 60% recognise non-standardised systems and processes affecting that final delivery. Proposed in 2009, HS2 was initially estimated to cost $45.6 Naturally, in 2009, we could never anticipate a global pandemic and the disruption it caused.

article thumbnail

Read About the Latest News on Construction Cost Stabilize, Submarine Construction Facility in Mobile, and US Army Engineers

Construction Daily News

According to the data, brick, structural clay tile, construction machinery, and switchgear costs did not change from the previous month. In an email to Construction Dive, Wilkins said diesel fuel, concrete pipe, steel mill goods, copper, and fabricated structural metal prices changed most last year. Marys Falls Canal on the St.