Remove 2010 Remove Change Management Remove Schedule Management
article thumbnail

Regional San’s monumental wastewater treatment plant expansion project delivered ON schedule and UNDER budget

Civil + Structural Engineer

The Sacramento region can expect to see big changes related to how wastewater is treated and reused with the completion of Regional San’s $1.7 Named the EchoWater Project , the immense upgrade was completed in spring 2023—on schedule and under budget. SACRAMENTO, CALIF. – billion, decade-long expansion.

Budgeting 130
article thumbnail

CONSTRUCTION PROJECT FAILURE FACTORS

Job Order Contracting

The real area of befuddlement is why real property owners have not changed the decades old legacy of rampant economic and environmental waste plaguing the AECCO sector (AECOO – Architecture, Engineering, Construction, Owner, Operator). International Journal of Project Management Belout, A., & Gauvreau, C. 1999). (1999).

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

Reduced project related cost growth per change order. Shorter construction schedules than planned. management. Journal of Management in Engineering, 10(6), 26-29. management in the UK construction industry. Management, 6(3), 159-168. International Journal of Project Management, 25(4), 386-393.

article thumbnail

SUDS, SABS AND STATUTES: HOW ENGLAND CAN TACKLE ITS SURFACE WATER PROBLEM

Civil + Structural Engineer

Schedule 3 of the Flood and Water Management Act 2010 provides a framework for the widespread adoption of SuDS and gives local authorities the role of sustainable drainage approval body (SAB), with responsibility for checking compliance and approving their use.

article thumbnail

Revit OpEd: 2012 Central States Revit Workshop - Omaha, Nebraska

Revit OpEd

This is the schedule/agenda for the two day Revitganza. Comments: Comments are moderated to manage spamming. Missing Foreword for Introducing Revit 2010. Changing a Username. ► 2010. ► December 2010. (30). ► November 2010. (31). ► October 2010. (30). ► July 2010.

article thumbnail

Why Projects Fail

Job Order Contracting

First and foremost is important to understand that all projects are exercises in managing change. The key to consistent delivery of successful projects therefore lies in the ability to account for and/or manage variations as they occur. Senior management failure is the #1 cause of poor project outcomes. Edwards Demming.

article thumbnail

Revit OpEd: Reference Planes and Wall Closure

Revit OpEd

These adjustments change the 3D model, not just the 2D plan-view. Note the two “wall closure” parameters (shown below) need to be “locked” so they stay positive (in the correct direction) when the host wall thickness changes. Comments: Comments are moderated to manage spamming. ► 2010.