Remove 2010 Remove Flooring Systems Remove Wall Systems
article thumbnail

Off-Grid Monolithic Cob House

Natural Building

It has a 1-kilowatt solar power system and a backup generator for electricity, a propane radiant in-floor heating system and a Rumford fireplace for heat, and a constructed wetland for natural wastewater treatment. This home is different because it’s a structural cob house, so the 2-foot thick walls are load-bearing.

article thumbnail

Revit OpEd: Measure Between Two References

Revit OpEd

Not much of a catch but there is no equivalent floor in this case. If there was a floor there Id just check the properties of the floor. you could sketch your own a floor around the perimeter pretty quickly. For my money, Id probably favor a floor. The downside is that is uses the wall's centerline.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Happy Birthday Revit

Revit OpEd

Missing Foreword for Introducing Revit 2010. Wall Floor Interaction and Linked Models. ► 2010. ► December 2010. (30). ► November 2010. (31). ► October 2010. (30). ► September 2010. (24). ► August 2010. (24). ► July 2010. (14).

article thumbnail

Revit OpEd: Layer Function Setting

Revit OpEd

System families have a Function setting. Thats true for Walls, Floor, Roofs and Ceilings. I run into wall types quite often that have these wrong or inconsistently applied. Missing Foreword for Introducing Revit 2010. Wall Floor Interaction and Linked Models. ► 2010. ► July 2010. (14).

article thumbnail

Revit OpEd: Wall Floor Interaction and Linked Models

Revit OpEd

Wall Floor Interaction and Linked Models. When we have architecture and structure in separate Revit models we end up with somewhat clumsy graphics in wall sections. The wall continues past the floor as if it isnt there. Labels: Collaboration , Floors , Linked Files , Walls. Wednesday, April 11, 2012.

article thumbnail

Sustainable, Award-winning Design gives New Life to Parkland Hospital

BDC Network

Ground was broken on the project in 2010, and the first patients were transferred from the old facility to the new one in the summer of 2015. The material was fabricated by NOW Specialties using their NOW 3100 route-and-return dry system.

article thumbnail

Revit OpEd: Workset Posts Summary

Revit OpEd

Revit 2010 Local Files. Workset Visibility in Linked Files (2010). Missing Foreword for Introducing Revit 2010. Wall Floor Interaction and Linked Models. ► 2010. ► December 2010. (30). ► November 2010. (31). ► October 2010. (30). ► September 2010. (24).