Remove 2011 Remove Building Commissioning Remove Carpentry Remove Schedule Management
article thumbnail

Dennis Calvert, the right architect for Design-Build

The Korte Company

Design-Build was not always accepted in the industry. So when he encountered Ralph Korte’s vision of Design-Build in action, he saw the industry’s future. . I crafted a lot of carpentry skills because my dad took time to teach me all of those things.” . The building owner Henry Hess was “delighted with the results.” .

article thumbnail

Uncover the Latest News on Timber Towers Legalized by a Seattle Architect and U.S. Chip Manufacturing Needs Women

Construction Daily News

She used the material to build modular classrooms, a church sanctuary, and her home. In 2010, 2011, and 2012, I was able to build my own house. Community Roots Housing manages it. Prefabrication and a fast building timetable should finish it in July. Wood dominates the building, despite steel and concrete.