Remove 2011 Remove Building Commissioning Remove Fire Protection Systems Remove Schedule Management
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

This work should be scheduled at non-peak hours. This standard is not intended to address all fall protection related equipment. All fall protection equipment is required by OSHA to be checked prior to each use. Schedule maintenance on these doors so that it does not interfere with loading dock operations. Lubricants.

article thumbnail

GSA, LEED, USGBC, and Politics

Building Information Management

General Services Administration (GSA) is to be commended for its leadership in improving energy and environmental performance across its federal building portfolio. GSA earned the highest rating in all categories in the 2011 sustainability scorecard released from the Office of Management and Budget (OMB). Airfresh Inc.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

QR Codes Unlocking Secrets of NYC Building Permits | ENR.

ENR Construction

Building Types. Survey Schedule. QR Codes Unlocking Secrets of NYC Building Permits. New York City building permits are sprouting up with QR codes that instantly unlock vast amounts of project information. of Buildings commissioner. The department launched the project in February 2011. Transportation.

article thumbnail

Uncover the Latest News on Timber Towers Legalized by a Seattle Architect and U.S. Chip Manufacturing Needs Women

Construction Daily News

She used the material to build modular classrooms, a church sanctuary, and her home. She helped design and conduct rigorous testing in 2017 to answer the concern that delayed mass timber’s adoption in the US years after it took off in Europe: Does it sustain fire? In 2010, 2011, and 2012, I was able to build my own house.