Remove 2011 Remove Building Controls Remove Cost Control
article thumbnail

Henry Construction crashes into administration

Construction Enquirer

Insolvency experts from FRP Advisory took control of the London-based residential tower builder yesterday evening. One rival main contractor said: “Henry’s have been buying work for years and it all seems to have come to ahead as soaring costs and labour caught up with the firm.

article thumbnail

Toll Brothers City Living® and Daiwa House Announce Joint Venture to Develop Waterfront High-Rise Condominium Community on New Jersey’s Gold Coast

Civil + Structural Engineer

Vista Pointe represents a rare opportunity to build a luxury waterfront community with outstanding amenities and unparalleled views of Manhattan. Since its formation in 2003, Toll Brothers City Living has completed 45 condominium buildings totaling over 7,200 residences.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Reverse Callback Templating - Perl.com

Construction Dive

To handle this in HTML::Template, you would generally build a nested data structure of anonymous arrays and hashes, and then process it against nested directives in the template. Template::Recall logic remains in the code, you would build a nested loop structure in Perl that calls the appropriate sections. December 2011 (1).

article thumbnail

Current and Future Use of BIM – 2013 – UK

Building Information Management

QTO, and an exclusively enhanced 400,000 line itme RSMeans Cost database. The study centered upon the development of Building Information Modelling (BIM) in the UK construction industry and its pontential affect on the role of the client’s construction manager (CM).

article thumbnail

Energy Savings from Heat Exchanger Assessments & Repairs

CCR Magazine

Read on for an overview of heat exchangers and learn how a regular assessment program saves energy, reduces costs, and helps facility staff stay focused on their priorities. The temperature at which the heat is reached can be precisely controlled by controlling the pressure of the steam. They should be cleaned annually.

article thumbnail

DoD FSRM, BUILDER SMS and the LEGACY of Wasteful Politics

Job Order Contracting

Zero credible cost visibility and inability to enable cost management… another instance of Government attempt to compete with the private sector and lack of capable and continuous accountable leadership. There are specialized SMS modules, such as BUILDER (buildings), RAILER (rails), ROOFER (roofs), and PAVER (pavements).

article thumbnail

Designing for recovery: The role of flooring in healthcare facilities

Construction Specifier

When specifying interior finishes such as flooring, building professionals should take the utmost care to ensure all materials help advance these overarching quality measurement components. 11 According to the Centers for Disease Control and Prevention (CDC), more than one million HAIs occur across the U.S.