Remove 2011 Remove Ceiling Systems Remove Flooring Systems Remove Roofing Systems
article thumbnail

Revit OpEd: Layer Function Setting

Revit OpEd

System families have a Function setting. Thats true for Walls, Floor, Roofs and Ceilings. Wall Floor Interaction and Linked Models. ► 2011. ► December 2011. (19). ► November 2011. (21). ► October 2011. (16). ► September 2011. (28). ► May 2011.

article thumbnail

Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

Open information exchange of Heating, Ventilating and Cooling systems (HVACie), released by the Engineer Research and Development Center for public review. HVACie extends the existing Industry Foundation Class Coordination View including equipment and system information streamlining construction shop drawing and fabrication.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

Open information exchange of Heating, Ventilating and Cooling systems (HVACie), released by the Engineer Research and Development Center for public review. HVACie extends the existing Industry Foundation Class Coordination View including equipment and system information streamlining construction shop drawing and fabrication.

article thumbnail

Revit OpEd: Wishlist - Families and Hide at Scales Coarser Than

Revit OpEd

It makes it easier to keep certain sections (details/wall sections) and elevations (interior) off of overall floor plan views for example. Related to this is the notion that there are representations that wed like to control for floor plan orientation and offer a different appear for the reflected ceiling plan (RCP) version.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard applies to all installed sprinkler systems with nozzles. This work should be scheduled prior to flushing system. Application: This standard applies to all installed flag poles with electric and manual cabling systems. Review manufacturer’s instructions for all system components. Check Points: 1.