Remove 2011 Remove Electrical Systems Remove Heavy Lifting Transportation Remove Renewable Energy Systems
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Review the Standard Operating Procedure for “Controlling Hazardous Energy Sources”. De-energize, lock out, and tag electrical circuits. Inspect electrical power panel. Check electrical connections and wiring for loose or overheated conditions. Door; Hydraulic, Electric or Pneumatic Operated. Check Points: 1.

article thumbnail

Cover Story: 2014 Business Facilities – Metro And Global Rankings

Business Facilities

We also configured our Renewable Energy Leaders category to rank the metros that are using the most renewable energy, with some surprising results (hint: the top-ranked metro is the home of the oil bidness). (To million toward economic growth projects (including a new streetcar system). billion over 2011-2012.