Remove 2011 Remove Fire Protection Systems Remove Flooring Systems Remove Painting/finishing
article thumbnail

Mindy Keiser always knows where to look

The Korte Company

Education is a powerful tool As a high schooler, Mindy took business classes that taught essential employment time management skills and practical tasks like how to organize filing systems. And they actually were able to fly me out there to see the finished product. Industry-wide cutbacks impacted her directly 2011. “I

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect Bollard/Barricade coatings, decals and paint. This standard is not intended to address all fall protection related equipment. All fall protection equipment is required by OSHA to be checked prior to each use. Touch up paint where required. Touch up paint where needed. Rust inhibitor and paint.

article thumbnail

GSA, LEED, USGBC, and Politics

Building Information Management

GSA earned the highest rating in all categories in the 2011 sustainability scorecard released from the Office of Management and Budget (OMB). performance building rating system in the United States. Alliance Environmental & Natural Systems Utilities, LLC. Alternative Energy Systems. Ethos Sustainable Finishes.