Remove 2012 Remove Collaboration Remove Contracts Remove Integrated Project Delivery (IPD)
article thumbnail

Demand For Efficient Life-Cycle Building Management Processes – BIM, JOC, IPD – FIATECH PRESENTATION – 2012

Building Information Management

Critical components of CONSTRUCTION PROJECT success include communication, collaboration, a defined mutually agreed upon operating relationship and an associated fully defined project scope of work… all of which are largely determined by the construction delivery method. Construction management is a process!

article thumbnail

IFMA 2012 – World Workplace and BIM

Building Information Management

On my way back from IFMA 2012, which included the initial meeting of the BIMLO committee/group. Lastly, collaborative construction project delivery methods are critical to BIM, including Integrated Project Delivery (IPD) for new construction, and Job Order Contracting (JOC) for renovation, repair, sustainability, and minor new construction.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

National Construction Contracts and Law Survey – UK – 2012

Building Information Management

NBS National Construction Contracts and Law Survey 2012. From March to April 2012, NBS a survey about contracts and legal issues within the UK construction industry. to understand, among other things: The different contracts and procurement methods being used. At what point in the process contracts are signed.

article thumbnail

BIM and Collaborative Construction Delivery Methods Legislation Proposed

Building Information Management

It appears that Capitol Hill is beginning to recognize the linkage between BIM and efficient project delivery methods such as IPD (Integrated Project Delivery) and JOC (Job Order Contracting), the latter a version of IPD targeting facility renovation, repair, and sustainability construction projects.

article thumbnail

The Business Value of BIM in North America 2007 – 2012

Building Information Management

Is the trend analysis of the Business Value of BIM in North America from 2007 through 2012 reality, or are many of us walking around with rose colored glasses? There is NO WAY 71% of ANY of the groups are “engaged with BIM on their projects”…period, end of story. Playing with Statistics?

article thumbnail

What is JOC – JOB ORDER CONTRACTING? A JOB ORDER CONTRACT?

Building Information Management

Job Order Contracting (JOC) is a firm fixed price, indefinite delivery, and indefinite quantity type contract used to execute sustainment, restoration, and modernization (SRM) projects at the installation. Early and ongoing information-sharing among project stakeholders. – INCOM 2009. – Tex.

article thumbnail

The Business Value of BIM in North America 2007 – 2012

Building Information Management

Is the trend analysis of the Business Value of BIM in North America from 2007 through 2012 reality, or are many of us walking around with rose colored glasses? There is NO WAY 71% of ANY of the groups are “engaged with BIM on their projects”…period, end of story. Playing with Statistics?