article thumbnail

Utility relocation costs for Fresno leg of California bullet train increase by $396M

Construction Dive

The new estimate represents a near 600% increase from CHSRA's 2013 estimate of $69 million.

article thumbnail

Results for the Construction Estimating Software Survey 2013

AEC Business

Over the past two months, Software Advice – a site that helps businesses evaluate construction technologies – surveyed the construction industry to better understand the use and effectiveness of construction estimating software.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Construction Cost Estimating, Location Factoring, and National Average Cost Data

Job Order Contracting

Many in the public sector are unaware of the construction cost estimating issues caused by the use of national average cost data and location factoring. They are not intended to be used when preparing appropriation-quality estimates. Here’s short summary of those problems noted by independent third parties. Peitlock, B.A.,

article thumbnail

Software Advice Surveys

Construction Dive

In 2013, it reported that 49% of its survey participants used spreadsheets, supporting ConstructionPro Network’s findings (17% of respondents still prepare an estimate manually, with 46% using a spreadsheet and 31% using an estimating program). Read more.'

Surveying 120
article thumbnail

Digital Dryshack #58, Estimating Survey 2013

Cassell Construction Estimating

June 10, 2013: Derek Singleton of Software Advice informed me last week that their new 2013 estimating software survey was recently published to the web. Check it out at Software Advice’s Estimating Survey 2013. If you’re an estimator, I suggest that you take the survey, as I did the other day.

article thumbnail

Current and Future Use of BIM – 2013 – UK

Building Information Management

The Origins of BIM -” BIM (Building Information Modelling/ Building Information Management) is a combination of 3D modelling technology and an open and sharing culture (Davies & Harty 2013). For example, the use of the BIM model to produce cost and time estimates has been identified as a paradigm shift (Gier 2008).

article thumbnail

Arizona Updates Minimum Wage Poster for 2013

Safety Services Company

Arizona Updates Minimum Wage Poster for 2013. Effective January 1, 2013, Arizona’s Minimum Wage Poster must reflect a 15-cent increase in the minimum wage, from $7.65 Between August 2011 and August 2012 that increase was estimated to be 1.7 For any tipped employees, the employer may pay up to $3.00