Remove 2014 Remove Cost Control Remove Quality Control
article thumbnail

The Evolution of Bridge Construction: Safer, Faster, Smarter

Civil + Structural Engineer

With a more optimized process, quality control, and automation, components can be produced faster than other systems on a construction site. The result provides higher productivity and lower costs with a reduction in safety risks.

article thumbnail

CONSTRUCTION PROJECT FAILURE FACTORS

Job Order Contracting

Project Management: Cost, Time, and Quality, Two Best Guesses and a Phenomenon, Its Time to Accept Other Success Criteria. Underestimating Costs in Public Works Projects: Error or Lie? Project management: a systems approach to planning, scheduling, and controlling. References: Atkinson, R. S., & Buhl, S.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Preparing Independent Government Estimates – IGEs , IGCEs

Job Order Contracting

Unfortunately, the process is largely done inappropriately and without cost transparency or visibility, and rarely is verifiable. Most Independent Government Cost Estimates are Not Well Documented. This has lead to the vast major of construction cost estimates (80% or more) being inaccurate. FAR 36.203.

article thumbnail

Construction Cost Estimating Trends – 2014 and Beyond

Building Information Management

Demand for higher productivity in the construction sector and environmental sustainability is reaching a critical level and causing significant changes in both construction cost estimating and the AEC industry as a whole. Major Trends: Shift to life-cycle cost visibility for new construction, renovation, repair, operations, and maintenance.

article thumbnail

DoD FSRM, BUILDER SMS and the LEGACY of Wasteful Politics

Job Order Contracting

Zero credible cost visibility and inability to enable cost management… another instance of Government attempt to compete with the private sector and lack of capable and continuous accountable leadership. DoD hasn’t achieved a clean audit since independent audits were initiated in 2017. 2014cv0173-62-0.

article thumbnail

Designing for recovery: The role of flooring in healthcare facilities

Construction Specifier

When specifying interior finishes such as flooring, building professionals should take the utmost care to ensure all materials help advance these overarching quality measurement components. 11 According to the Centers for Disease Control and Prevention (CDC), more than one million HAIs occur across the U.S.

article thumbnail

Zweig Group’s 2024 Rising Stars In the AEC Industry

Civil + Structural Engineer

Jeremy’s leadership qualities are also evident in his ability to inspire and motivate those around him. At the age of 27, Akshaya co-founded Peritia Partners, a construction consulting firm with experts who have advised over $130 billion in projects in construction management, project controls, and construction dispute resolution.