Remove 2015 Remove Building Performance Measurement Remove Risk Management
article thumbnail

2023 Yearbook of Engineering Achievement: Transportation & Infrastructure

Civil + Structural Engineer

The project leveraged four alternative delivery methods including: landside and airside construction management at-risk, a design-build-operate-maintain baggage team, design-bid-build award contracts and multiple design-build concession/tenant packages. Construction Management Co.:

article thumbnail

Standards for Building Economics

Building Information Management

on Building Economics. E833-14 Standard Terminology of Building Economics. E917-15 Standard Practice for Measuring Life-Cycle Costs of Buildings and Building Systems. E964-15 Standard Practice for Measuring Benefit-to-Cost and Savings-to-Investment Ratios for Buildings and Building Systems.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why Efficient Facility Management Is So Difficult

Building Information Management

The fundamental reason is the inability of Owners to transition from the linear and antagonistic work process of the pre-1980’s to collaborative, transparent, LEAN best management practices. Change management . Risk/reward is shared an additional work and resources are allocated based upon performance.

article thumbnail

The Start of Celebration: the 2023 Yearbook of Engineering Achievement

Civil + Structural Engineer

The project leveraged four alternative delivery methods including: landside and airside construction management at-risk, a design-build-operate-maintain baggage team, design-bid-build award contracts and multiple design-build concession/tenant packages. Construction Management Co.:

article thumbnail

Federal Facilities at High Risk

Building Information Management

Each year the GAO updates its “High Risk Series” This is a report on areas of critical concern at the Federal level, yet not being properly address. For the 2015 Update, “Managing Federal Real Property” is on the list. Since I began my facilities career in 1988 as a member of VFA, Inc.’s

article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

Robust collaborative construction delivery methods provide a proven path for Owners to significantly improve construction productivity and levels of satisfaction among a participants and building users. – 2016, Arizona State University – Job Order Contracting Performance Survey-2015. JOC Do’s and Don’ts.

article thumbnail

Exterior cavity fireblocking: Exceeding fire performance

Construction Specifier

and Steven Gaynor, MBA Photo courtesy Tenmat New York City recently became the first jurisdiction in the country to reject and rewrite major sections of the International Building Code’s ( IBC ’s) language around fire protection in exterior facades. For decades, buildings have relied on intumescent materials for fire control.