Remove 2015 Remove Building Standards Remove Integrated Project Delivery (IPD)
article thumbnail

The Problem with the UK’s BIM Strategy

Building Information Management

The fundamental problem with the UK’s BIM Strategy is found within the following quotation “digital technology is changing the way we plan, build, maintain and use our social and economic infrastructure.”(Source: ”(Source: 2015, Level 3 Building Information Modelling – Strategic Plan, HM Government).

article thumbnail

The Problem with the UK’s BIM Strategy

Building Information Management

The fundamental problem with the UK’s BIM Strategy is found within the following quotation “digital technology is changing the way we plan, build, maintain and use our social and economic infrastructure.”(Source: ”(Source: 2015, Level 3 Building Information Modelling – Strategic Plan, HM Government).

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why Efficient Facility Management Is So Difficult

Building Information Management

Efficient construction delivery methods have been available and successfully practiced for decades. The most widely used are Integrated Project DeliveryIPD, and Job Order Contracting – JOC. IPD, JOC, and other efficient construction delivery methods require “buy-in” by all participants.

article thumbnail

Worldwide Need for Construction Collaboration

Building Information Management

Studies have proven that collaborative construction delivery methods and a focus upon value provide a higher return on investment. The most recent report is the NATIONAL CONSTRUCTION AND CONTRACTS LAW SURVEY, 2015, NBS. The construction delivery method affects the outcome of any renovation, repair, or new construction project.

article thumbnail

Job Order Contracting Information

Job Order Contracting

Public works contracts vary from private sector contracts in that legislation sets the contracting guidelines for contracts and the public interest demands safeguarding process integrity. Also referred to as the “Design-Bid-Build” process, this system has long been the most prevalent option for large and small public works contracts.

article thumbnail

LEAN Construction Delivery – Not New

Building Information Management

While LEAN Construction Delivery Methods have existing for decades are are proven to improve productivity, reduce waste, lower cost, speed delivery, and improve quality… most real property owners lack the required capability, understanding, and/or awareness for implementation. Standardized Information. Shared risk/reward.

article thumbnail

LEAN Job Order Contracting Intro 4

Job Order Contracting

Integrating operating, design and construction knowledge through broad based team meetings. Building Information Modelling BIM in the Construction Industry – Technical Report TR-1405. should not be considered LEAN efficient construction delivery methods. should not be considered LEAN efficient construction delivery methods.