article thumbnail

JOC Study Announced – Value of Job Order Contracting and Integrated Project Delivery

Building Information Management

via [link] – 4Clicks Solutions develops and delivers a comprehensive suite of construction cost estimating and project management software to connect people, information and processes – anytime, anywhere. Milestone Schedule: The expected duration of this study will be 1 year (Jan 2015 – Jan 2016).

article thumbnail

Why Efficient Facility Management Is So Difficult

Building Information Management

Efficient construction delivery methods have been available and successfully practiced for decades. The most widely used are Integrated Project DeliveryIPD, and Job Order Contracting – JOC. IPD, JOC, and other efficient construction delivery methods require “buy-in” by all participants.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – Lean Construction History

Job Order Contracting

The LEAN Integrated Construction Project Delivery Method. . Traditional design-bid-build (DBB) construction delivery was too inefficient for the large numbers of renovation, repair, and sustainment/maintenance projects. Integrate Partnering Into a Dispute Resolution System. Making Partnering Mandatory.

article thumbnail

Worldwide Need for Construction Collaboration

Building Information Management

Studies have proven that collaborative construction delivery methods and a focus upon value provide a higher return on investment. The most recent report is the NATIONAL CONSTRUCTION AND CONTRACTS LAW SURVEY, 2015, NBS. The construction delivery method affects the outcome of any renovation, repair, or new construction project.

article thumbnail

LEAN Construction Delivery – Not New

Building Information Management

While LEAN Construction Delivery Methods have existing for decades are are proven to improve productivity, reduce waste, lower cost, speed delivery, and improve quality… most real property owners lack the required capability, understanding, and/or awareness for implementation. The focus of LEAN is best value and minimized waste.

article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

The way to deliver 96%+ of renovation, repair, and maintenance projects on-time, on-budget, and at the appropriate level of quality is to enable collaboration with contractors and other expert service providers. – 2016, Arizona State University – Job Order Contracting Performance Survey-2015.

article thumbnail

Attention JOC Contractors – Please participate in the ASU National Job Order Contracting Study

Building Information Management

School of Sustainable Engineering and Built Environment Date: June 24, 2015. The Performance Based Studies Research Group (PBSRG) out of Arizona State University (ASU) is currently conducting an industry wide study evaluating the Job Order Contracting (JOC) construction delivery method.