Remove 2016 Remove Building Performance Measurement Remove Estimating
article thumbnail

University of Nevada, Reno pavement testing technology hits the market

Civil + Structural Engineer

The new quality-control tool for road construction will enable crews to verify pavement quality as they build asphalt roads rather than waiting until after construction and using core samples to determine density of asphalt.

article thumbnail

Standards for Building Economics

Building Information Management

on Building Economics. E833-14 Standard Terminology of Building Economics. E917-15 Standard Practice for Measuring Life-Cycle Costs of Buildings and Building Systems. E964-15 Standard Practice for Measuring Benefit-to-Cost and Savings-to-Investment Ratios for Buildings and Building Systems.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Code Compliance & Beyond: Upping Baseline Building Energy Performance

Stok

Due to their embodied carbon and operational carbon footprints, buildings play a significant role in these efforts, so understanding the impact of legislation on buildings is critical. This directly translates to building energy codes. And, the result of this baseline? How to approach compliance.

article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

Robust collaborative construction delivery methods provide a proven path for Owners to significantly improve construction productivity and levels of satisfaction among a participants and building users. – 2016, Arizona State University – Job Order Contracting Performance Survey-2015. JOC Do’s and Don’ts.

article thumbnail

An Introduction to Job Order Contracting

Job Order Contracting

JOC Programs are competitively procured, performance-based, and supports long-term owner-contractor relationships. JOC’s history begins with the US Army in Europe in the 1980’s. Components of the OpenJOC UPB Estimate – Determine quantities of work • Build the estimate from UPB • Summarize the estimate and apply coefficient.

article thumbnail

Why Efficient Facility Management Is So Difficult

Building Information Management

While both IPD and JOC provide established and clear benefits versus design-bid-build – DBB, design-build – DB, and other construction delivery methods, their consistent usage and application has been relatively limited. Risk/reward is shared an additional work and resources are allocated based upon performance.

article thumbnail

Hear about the latest news on Ferrovial UK loses 30 Million Pounds, Five UK construction slowdown solutions, UK construction peaks, MSPs and CIOB debate fixing Scotland’s draughty homes

UK Construction Blog

The Secretary of State grants Development authorisation Orders (DCOs) for Nationally Significant Infrastructure Projects (NSIPs), combining planning authority with additional consents such listed building authorisation. DCO rulings were mostly on time or early from 2012 to 2016, resulting in a 509-day total delay at the end of 2016.