Remove 2016 Remove Building Performance Measurement Remove Estimating Remove Land Use Regulations
article thumbnail

The Start of Celebration: the 2023 Yearbook of Engineering Achievement

Civil + Structural Engineer

The project leveraged four alternative delivery methods including: landside and airside construction management at-risk, a design-build-operate-maintain baggage team, design-bid-build award contracts and multiple design-build concession/tenant packages.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Masterformat is a multiple level data structure consisting of numbers and titles/descriptions used to organize information by “work results” or construction practices. Measured Drawing Information. 00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Masterformat is a multiple level data structure consisting of numbers and titles/descriptions used to organize information by “work results” or construction practices. Measured Drawing Information. 00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract).