Remove 2016 Remove Electrical Systems Remove Site Planning Remove Steel Fabrication
article thumbnail

The Start of Celebration: the 2023 Yearbook of Engineering Achievement

Civil + Structural Engineer

It features elements that maximize the safety, security, and efficiency of the travel process including 100 percent automated screening lanes, 100 percent facial recognition “e-gates” for international departure, an innovative landside terminal design, and 100 percent trackable RFID Independent Carrier System.

article thumbnail

Keeping Up With Advanced Manufacturing

Business Facilities

From the September/October 2016 Issue. There has been an 81 percent retention rate among the 2015-2016 class of Tennessee Promise students. Eurotranciatura, a subsidiary of the world’s largest steel lamination company, is investing $12.6 In August 2016, advanced manufacturer ATC announced it will invest $10.4

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit 2017 - New Features and Enhancements

Revit OpEd

Last year I promised myself (and family) I wouldn't submit for any speaking engagements in the coming year (2016). Autodesk released Revit 2016 R2 like they did with Revit 2015 the year before. We'll see a need for upgrading from 2016 to 2017 files but not from 2016 to 2016 R2 files. Okay, on to the list!

article thumbnail

Cover Story: 2014 Business Facilities Rankings Report

Business Facilities

The state also fully implemented its Tennessee Educator Acceleration Model (TEAM) educator evaluation system. Moving into Year 4 of its grant, Tennessee plans to build on its progress and continuously improve implementation of its key initiatives. Auto Giants Keep Getting Bigger. Shelton is using the largest portion of the funds ($1.2

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Site and Infrastructure Subgroup: Divisions 30 – 39. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Site Survey Information.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Site and Infrastructure Subgroup: Divisions 30 – 39. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Site Survey Information.

article thumbnail

Less Is More In New England

Business Facilities

percent in 2016, was down 0.8 of Labor BLS, noted that New England’s unemployment rate was measurably lower than the national average in 2016—Maine’s unemployment rate was 3.9 percent in December 2016, marking the sixth consecutive month the rate had declined. percent the same time in 2016. percentage points to 4.9