An Introduction to Job Order Contracting

Job Order Contracting

JOC reduces unnecessary levels of engineering, design, and contract procurement time along with construction project procurement costs by awarding long- term contracts for a wide variety of renovation, repair and new construction projects. Smaller projects were taking up to 1 year to procure creating a growing backlog of work.

article thumbnail

Area Cost Factors – Not a viable for Federal Construction Cost Estimating?

Job Order Contracting

Should Areas Cost Factors be used for Construction Cost Estimating? As a result, more than 40 years after the introduction of area cost factors (ACFs), the federal government is no closer to its goals of having construction cost estimates match actual construction costs, or properly adjusting for regional (location based) variances.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

On Call Renovation, Repair Construction – Job Order Contracting

Job Order Contracting

to 1.20, that is multiplied times the total of the construction costs estimate as developed using the UPB. Job Order Contracts can be deployed and managed directly by an Owner, (Owner-managed JOC) deployed and managed in association with a JOC Consultant (outsourced-JOC), or JOC service may be procured through a Cooperative.

article thumbnail

STOP using ACFs – The inherent flaws of Area Cost Factors

Job Order Contracting

As a result, more than 40 years after the introduction of area cost factors (ACFs), the Department of Defense (and the Federal Government in general) is no closer to its goals of having construction cost estimates match actual construction costs, or properly adjusting for regional (location based) and/or time-based cost variances.

article thumbnail

Best Practice Job Order Contracting

Job Order Contracting

County, State, and Local Governments, include secondary education unfortunately continue to use JOC simply as a means to speed delivery and bypass traditional procurement versus as a LEAN collaborative construction delivery method. Bonding must be sufficient to cover the stated estimated annual maximum contract value.

article thumbnail

The FM Mismanagement Problem Defined

Job Order Contracting

There is not a single public sector organization that has a robust, proven programmatic planning, procurement, and project delivery method that provides financial visibility and transparency , and the ability to support decision-making to assure the consistent quality, on-time, and on-budget outcomes, system-wide. (A

article thumbnail

Achieving Best Value for Facility Renovation, Repair, Maintenance, and Construction – 2016 and Beyond

Building Information Management

The process is extremely wasteful in terms of resources spent upon procurement, associate construction delays, poor quality, and the common occurrence of legal disputes. is a factor used to multiply against the estimates prepared using the UPB. This value, usually between 0.80