Remove 2017 Remove Electrical Systems Remove Site Planning
article thumbnail

2023 Yearbook of Engineering Achievement: Transportation & Infrastructure

Civil + Structural Engineer

It features elements that maximize the safety, security, and efficiency of the travel process including 100 percent automated screening lanes, 100 percent facial recognition “e-gates” for international departure, an innovative landside terminal design, and 100 percent trackable RFID Independent Carrier System.

article thumbnail

2023 Yearbook of Engineering Achievement: Water/Stormwater

Civil + Structural Engineer

Alpha Testing utilized two on-site laboratories and up to 15 full-time field and laboratory personnel to serve the Bois d’Arc lake project that will span 16,641 acres. The 90-inch diameter Raw Water Pipeline travels 35 miles from the dam, delivering untreated water to the treatment plant. C Below, Inc., Terracon Consultants, Inc.,

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Housing, Industrialized: Designing for Off-Site

The Pro Builder

but one that needs to take place if home builders want to successfully transition from on-site stick-building to an off-site or factory-built model for the bulk of their structural needs. Beazer Homes partnered with Entekra , a panelized systems provider in Modesto, Calif.,

article thumbnail

Disaster response planning around the globe

Civil + Structural Engineer

Poor planning leads to, well, poor performance. In an ideal world, we would have the same thousands of experts and years of time to plan all conceivable permutations of the disaster to develop an appropriate disaster response plan. Is there sufficient power in the grid to meet this new demand? What about the hospitals?

article thumbnail

The Start of Celebration: the 2023 Yearbook of Engineering Achievement

Civil + Structural Engineer

It features elements that maximize the safety, security, and efficiency of the travel process including 100 percent automated screening lanes, 100 percent facial recognition “e-gates” for international departure, an innovative landside terminal design, and 100 percent trackable RFID Independent Carrier System.

article thumbnail

Read the Latest News on Masdar Arlington Energy Builds a 55 MW Battery Plant in UK, EV Trial Has Been Completed by Costain and Enterprise, Environmental Issues Raised by Airport Building, Plans for a UK Hydrogen Facility Were Revealed

UK Construction Blog

The post Read the Latest News on Masdar Arlington Energy Builds a 55 MW Battery Plant in UK, EV Trial Has Been Completed by Costain and Enterprise, Environmental Issues Raised by Airport Building, Plans for a UK Hydrogen Facility Were Revealed appeared first on UK Construction Blog.

article thumbnail

Revit 2017 - New Features and Enhancements

Revit OpEd

Last night I was able to download and install Building Design Suite 2017 from my Autodesk subscription account. With little fanfare Revit 2017 is here, brandishing a slightly changed big R logo. We'll see a need for upgrading from 2016 to 2017 files but not from 2016 to 2016 R2 files. Long Post Warning, worth it I hope.