2023 Yearbook of Engineering Achievement: Water/Stormwater
Civil + Structural Engineer
DECEMBER 1, 2023
Alpha Testing utilized two on-site laboratories and up to 15 full-time field and laboratory personnel to serve the Bois d’Arc lake project that will span 16,641 acres. The 90-inch diameter Raw Water Pipeline travels 35 miles from the dam, delivering untreated water to the treatment plant. C Below, Inc., Terracon Consultants, Inc.,
Let's personalize your content